LOADING锐赛克 · ResourceCycle
对苯二甲酸二甲酯 (DMT)
生产厂家
Preparing content
Preparing content
Methanolysis plant economics · Quick estimate · Real engineering data
Adjust parameters to see payback period, annual EBITDA, CO₂ reduction in real time. Indicative only — contact sales for full feasibility study.
Estimate based on ResourceCycle measured engineering averages: 1.08 t/t PET, 0.32 t/t methanol, Zn-Mn catalyst, 4-stage distillation, gradient crystallisation. EG credit 0.6 t/t × ¥4,800/t. Fixed cost: labor ¥1.2M + maintenance ¥200/t + depreciation 3% capex.
Results indicative only. Actual project economics depend on feedstock / product prices, scale, location, subsidies. Contact ResourceCycle sales for full feasibility study.